In December 2022 the Management Committee decided to install a solar power system at the society’s site office, in response to rising electricity costs.
A 20 kW system was installed through a tender. It powers the site office and the new lights along the main road, from the entrance to the site office, reducing the society’s electricity bills and its carbon footprint.
In August 2025 a further tender was published for a 20 kW on-grid system and a 7 kW increase to the installed system.
Progress
- Dec 2022Management Committee decided to install a solar power system at the society's site office.
- 27 Jan 2023Tender for Installation of Solar System published.
- Mar 202320 kW system installed; it powers the site office and the main-road lights.
- 28 Aug 2025Tender published for a 20 kW on-grid solar system and a 7 kW increase to the installed system.